On 13th July 2016, contract was signed between GUNAL MAPA, main contractor and MAGICAL PRODUCTION LLC for the manufacture of all components following approval of final design as Cascades/Waterfalls on Metro & Safa sides. The timing was extremely hard to respect as water flooded canal on October 26. Every single job inside canal was not possible from that date.